Quantcast

Demolition History

Clinical Engineering

Clinical Engineering was a 4,714, gross square foot, prefabricated structure placed on the east side of the hospital in 1987. This building was demolished in December 2003, when Clinical Engineering relocated to space in the main hospital basement.